This highly digitalized industrial facility operates exclusively on renewable energy, fully eliminating the reliance on fossil fuels and achieving the lowest possible environmental impact. As part of a regional infrastructure transformation, the project includes extensive railway and civil engineering works, including underpasses, and roads, improving both rail operations and local infrastructure. The team didn’t just use Dalux, they embedded it into every layer of the project, transforming the entire site into a fully connected ecosystem. This enabled a transparent, collaborative construction process and marked a shift in how the team conceives, manages, and executes infrastructure projects.